Thursday, 27 October 2011

If our validation is not written around the clauses of the standard, is this going to be non-conformity at our audit?

No. However, if the report does not cover all of the requirements of the standard (e.g. characterisation of the sterilisation equipment) the auditor will ask for this in addition. Reviews of sterilisation by notified bodies are based on the time needed – if there are non-conformities or missing information then the review costs can go up and the time taken to complete the review gets longer.

Wednesday, 26 October 2011

If we subcontract sterilisation, what if they won’t give us information on changes to their steriliser or details of the equipment?

Your contract with the subcontract sterilisation company should require them to provide you with information if needed on some of their activities (as relevant to the sterilisation process). These types of things may include installation qualification, operation qualification, calibration, maintenance, repair activities, etc. It is common that the sterilisation subcontractor will allow you to look at some of these on-site but would not give copies to you (e.g. for commissioning records). Your contract should require the sterilisation facility to provide any records necessary to demonstrate compliance directly to your notified body. In practice, if they are certified to ISO13485 and to the harmonised sterilisation standard and this certificate is issued by a notified body then we don’t tend to look at these unless there is a concern. I would expect the sterilisation contractor to give you a summary of any major steriliser maintenance or at least confirm that if they have done something, then they suitably re-qualified the chamber afterwards (IQ/OQ).

For a USB dongle product which plugs into a Notebook, what type of SAR testing would be required? Is testing for the bottom and outer edge positions for the conservative consideration sufficient enough for CE SAR testing? Or do we just need to perform the SAR on the bottom position?


Based on the EN 62209-2 standard, the device should be positioned so that the peak SAR can be measured. The manufacturer’s intended use configuration needs to be considered for the device implementation. The test configurations you mention which is the bottom of the USB and the outer edge of USB would need to be included in the SAR evaluation. Additionally the user facing side of the USB would also need to be included in the assessment as well for R&TTE requirements. A USB device manufacturer would need to take into account that usb ports may be located on different sides of tablets or laptops and in different orientations, either horizontal or vertical receptacles. These variables related to the end use configuration forms the reasoning for assessment being carried out on all of the faces of the USB modem. Typically we would advise the USB device is tested with a modern laptop, similar to the FCC compliance methodology. One approach is to carry out area scans on the applicable sides of the USB to determine the worst case exposure position and then a full scan on the worst case side. That approach would be taken for each frequency, ensuring that each modulation and mode is considered in the test plan. If the USB dongle has a swivel function such that the antenna can rotate, there are additional considerations included in the EN 62209-2 specification.

Right now we are about to look into CE LTE SAR testing, do you have any related guidance for the CE LTE SAR testing? As you many know, FCC had released KDB document (KDB 941225 D05) for the LTE SAR test consideration.

In terms of standards, the European standards for Head and Body SAR testing like EN 62209-1, EN 62209-2 and EN 62311 do not specifically address specific technologies such as LTE. The test guidance is relatively generic where they tend to provide guidance on device transmission settings, duty cycles, the modes to be covered, as well as considerations for antenna configurations and multiple operating modes where a device has multiple transmitters which can transmit simultaneously.

For R&TTE Directive compliance where a device supports multiple modes of operation, if SAR testing is to be streamlined due to the various LTE modes, channel bandwidths and resource block allocations one way to minimize is by taking output power measurements for all of the modes and measuring in the modes which have a higher RF output and the same can be done where there are multiple transmit slots. We would be looking for the SAR report to include an explanation of the operating modes which were selected for test based on the power level, frequency and antenna used.

The FCC KDB methodology would be recommended as it does provide clear guidance on channels, resource block allocations and channel bandwidth(s) that are to be tested based on the FCC lab guidance on LTE. Future releases of the IEC head and body standards will hopefully include more technology based guidance. The FCC KDB 941225 D05 procedure can be obtained from the FCC website from the Knowledge Database Publications page.


Tuesday, 25 October 2011

TÜV SÜD takes on the Great South Run!

  
This year’s Great South Run will takes place on Sunday 30th October 2011 with around 20,000 runners taking part, raising millions for various charities. 10 runners from TÜV SÜD Product Service will be taking part in the 10 mile event to raise money for Make-A-Wish Foundation .

Make-A-Wish Foundation has given hope, strength and joy to children with life-threatening medical conditions, granting over 75 wishes a month, this year alone 1,200 children will have their special wish granted. Employees of TÜV SÜD Product Service chose Make-a-Wish Foundation in 2010 as the destination for all its charitable donations and it has since been chosen for a second year.  In total nearly £2000 has been raised by employees from various events including, monthly dressed down days, a cycling challenge, an open day and raffle. The Great South Run Team is hoping to add to this fund, proposing an ambitious event target of £500.

To show your support for the TÜV SÜD Great South Run Team and raise money for the very worthwhile Make-a-Wish Foundation, please visit our fundraising page where you can make donations and leave a message of encouragement: http://www.justgiving.com/TUVSUDGSR2011

Don’t forget to come and show your support on the 30th October and cheer along the team!
What is the difference between the EN 50371 and EN 62479 standard?

The EN 62479 has additional methodologies (four possible compliance routes) of demonstrating compliance over that which EN 50371 covered. The EN 50371 standard provided mainly a basis that where the average output power emitted is less than or equal to 20mW and the transmitting peak is less than 20W then the apparatus was deemed to comply with the basic restrictions without testing.
  • The EN 62479 standard provides four possible compliance routes, including the one listed in EN 50371 (See EN 62479 Section 4.1A - 4.1D and Section 4.2). The possible compliance routes are presented graphically on page 10 of EN 62479.
  •  Annex A.2 provides the Low power exclusion level (Pmax) which is, the SAR limit (2.0W/kg for general population exposure) multiplied by the averaging mass which is 10g for localised SAR. So the low power exclusion level, Pmax for general population exposure for localised SAR would be 20mW. For occupational exposure, the SAR limit is greater and therefore Pmax would be greater.
  •  Section 4 provides additional general considerations for example for transmitters where there is more than one antenna configuration, and also guidance on exposure for multiple transmitting sources (simultaneous transmission)
  • Section 5 provides guidelines on the EN 62479 assessment reporting requirements.
  •  Section 6 provides guidance on the use of Measurement Uncertainty in the evaluation of compliance to limits.
  •  Annex B provides an alternate Pmax derivation for devices located within 25mm of the body and within 300MHz to 6GHz.
  •  Annex C provides compliance requirement for a pulsed field.
The BS EN 62479: 2010 standard can be downloaded from BSOL as the BS EN has now been published.